Beit Ummar Kindergarten: Groundwork

The first stage of Beit Ummar kindergarten focused on constructing the foundation and floor, marking significant progress towards enhancing early childhood education infrastructure.

Development
Education
Children
Kindergarten Construction
Early Childhood Education

Project Planning

Project Financing

Starting Work

Achieving Achievements

Story

Introduction

The first phase of the Beit Ummar Kindergarten project focused on laying the essential groundwork for the future development of the facility. This stage was critical, as it involved preparing the site, and ensuring that the foundation was properly established for the kindergarten's long-term stability and durability. That done by marking the land, conducting excavations, clearing the land from debris and flatten it, finally laying the concrete foundation. This foundational work is a critical component in the successful completion of the overall project.


Case

Before any construction could begin, a suitable plot of land had to be acquired. The original site lacked proper infrastructure, and its uneven land presented significant challenges for safe construction. Additionally, the absence of a proper drainage system posed the risk of water damage during the rainy season. Addressing these issues was essential for ensuring a secure and long-lasting foundation.


Solutions

The first phase challenge was to prepare the land for construction. The project teem began by making detailed site assessments to evaluate its suitability for building. The first step was to mark the land and start clearing and leveling the ground, followed by excavation work to prepare for the construction of reinforced concrete foundation. The project team also took measures to install an effective drainage system to protect the site from potential environmental damage.


Activities

The activities undertaken during this phase were extensive and required careful planning.

  1. Marking the Land: the first step was to marking the land which done by Engineers using surveying tools to mark the layout of the building on the land. This will ensure that the kindergarten’s structure would be positioned correctly according to the architectural plans. This process included defining the boundaries of the building and marking key points for the foundation.
  2. Site Preparation: The land was uneven and required substantial grading to make it suitable for construction. Specialized machinery was used to level the ground, ensuring a flat surface for laying the foundation.
  3. Foundation Laying: One of the most critical tasks in this phase was the laying of a reinforced concrete foundation. The concrete used was carefully selected to ensure it could withstand the weight of the building and meet international safety standards. Steel reinforcements were placed within the concrete to enhance its strength and durability.
  4. Drainage Installation: A drainage system was installed to protect the site from flooding and water damage. This system was designed to divert rainwater away from the foundation, ensuring the long-term stability of the building.
  5. Material Procurement: A significant part of the activities involved sourcing construction materials from local suppliers. The team procured high-quality cement, steel, and other essential materials needed for the foundation work. This not only ensured the quality of the construction but also provided economic benefits to local businesses.
Results

Achieved Outcomes

The first phase of the project was successfully completed, with the land marked, the ground leveled, and the foundation laid. The site is now fully prepared for the second phase of construction, which will involve building the walls, roof, and internal infrastructure. This first phase was completed on time and within budget, providing a solid base for the next steps.


Social Impact

The marking of the land and the completion of the foundation have already begun to positively affect the local community. The successful start of the project has instilled confidence among community members, who now see solid progress toward a modern, child-friendly educational facility. Community members have expressed excitement about the project, and their continued involvement is expected as the project moves into the second phase.


Economic Impact

The first phase generated employment for local construction workers and boosted the local economy by purchasing materials from nearby suppliers. As the project moves forward, it will continue to create jobs and stimulate economic growth in the region, making the kindergarten a key driver of local development.


Conclusion

The completion of the first phase of the Beit Ummar Kindergarten project has laid the groundwork for the future of the facility. With the land marked and the foundation set, the project is well-positioned to move into its next phase, which will involve constructing the building’s structure. The success of this initial phase ensures that the community will soon benefit from a modern educational facility, creating new opportunities for children and contributing to the region’s overall development.

Updates

Building Site Demarcation

The building site was demarcated and established.

Receipt of Construction Materials

The iron and other materials required for the construction and foundation has been received.

Groundwork Completed

The foundational groundwork for the Beit Ummar Kindergarten was successfully completed, marking the start of the next phase of construction.

Frequently Asked Questions
  • What is the project's goal?

    To build a kindergarten with modern facilities.

  • Did you face any challenges?

    The war and conflict was the biggest challenged, we started the first stage of the project started on September 2023, and the war broke out on October 2023, due to that, a road blockage occurred all across the West Bank. The costs of the material needed for the construction of the kindergarten jumped significantly.

  • Did you have any difficulties with receiving the funds?

    A delay in receiving the funds happened due to the current war conflict.

  • What was the worse impact the war caused?

    The cost of the project as planned was a $100,000 but after the war broke out, and the prices jumped, now we need around $140,000 to be able to finish the kindergarten.

  • Did you hire a contracting company? And What's the name of the contracting company?

    Yes, we did. The company is called The Golden Tape and it's a local Palestinian contracting company.

Main Project
Beit Ummar Kindergarten
Beit Ummar's kindergarten project aims to improve early childhood education in a safe, up-to-date, and sustainable environment, offering space for children to improve educationally.